| Application and installation | Specify whether the system is for a home, small business, off-grid site, backup power, or self-consumption. Identify indoor or outdoor placement. | Residential self-consumption with backup capability in a utility room or protected outdoor location. | Available system configurations, installation requirements, permitted operating environment, and applicable local codes. |
| Usable energy capacity | Estimate daily energy use and the portion of that use the battery should cover. Distinguish usable capacity from nominal capacity. | A residential project may compare systems in the approximate 5–20 kWh usable-capacity range; the right size depends on load and duration requirements. | Usable energy per module, system-level usable capacity, capacity at specified conditions, and how capacity is measured. |
| Continuous and peak power | List the loads that may operate at the same time, including motors or other equipment with high starting demand. | For a home, a planning range of roughly 3–10 kW continuous output may be relevant, depending on the loads and inverter design. | Continuous output, short-duration peak output and its duration, surge behavior, and any limits when modules are added. |
| Backup duration and loads | Identify essential circuits and estimate their energy use during an outage. State the required backup duration. | Define a specific essential-load list and calculate the required kWh for the intended outage period instead of relying on a general runtime claim. | Backup operating mode, supported loads, transfer arrangements, and whether a compatible inverter or additional equipment is needed. |
| Battery chemistry | Choose the battery chemistry based on safety, usable energy, expected operation, and project requirements. | Lithium iron phosphate (LFP) is a common choice for stationary storage; suitability still depends on system design and installation conditions. | Cell chemistry, cell sourcing and traceability practices, battery management protections, and safety documentation. |
| Modular expansion | Define the starting capacity and the future capacity you may need. Check whether expansion will happen at installation or later. | Plan for the intended number of modules and total system capacity, with expansion subject to the system’s documented limits. | Supported module combinations, maximum module count, compatibility rules, expansion procedure, and whether mixed module ages or capacities are allowed. |
| Inverter and electrical compatibility | Specify the required AC connection, nominal voltage and frequency, grid connection, and any existing inverter or equipment. | For a grid-connected project, match the battery system to the local electrical supply and the selected inverter architecture. | Compatible inverters, communication protocols, electrical ratings, grid-interconnection requirements, and compatibility evidence. |
| Efficiency and operating limits | Set expectations for energy losses and define operating temperature and installation conditions. | Compare round-trip efficiency using the same measurement boundary and test conditions; values around 90% or higher are a useful comparison point, not a guarantee. | Test conditions and system boundary for efficiency, operating-temperature limits, derating behavior, and any thermal-management requirements. |
| Cycle life and warranty | Define the expected service period, daily use pattern, and acceptable end-of-warranty capacity. | Compare cycle-life claims only when depth of discharge, temperature, charge/discharge rate, and end-of-life capacity are stated. | Written warranty terms, covered components, throughput or cycle limits, capacity-retention conditions, and claim procedures. |
| Safety and compliance | Identify the certifications, transport documents, and local approvals applicable to the destination market and installation. | Requirements vary by market. Examples of standards or documents to verify include UL 9540, UL 9540A test information, IEC 62619, and UN 38.3 transport testing, where applicable. | Certificate numbers, issuing bodies, exact covered models, test reports where available, and confirmation that documentation applies to the proposed system configuration. |
| Enclosure and environmental protection | State whether the battery will be installed indoors or outdoors and describe exposure to dust, water, humidity, and temperature. | Choose an enclosure rating and operating range appropriate to the actual installation location; do not assume every stackable battery is suitable for outdoor use. | Ingress-protection rating, environmental limits, mounting requirements, ventilation or clearance needs, and installation instructions. |
| Monitoring and service | Define the data users and installers need, such as state of charge, alarms, energy flows, and system status. | Request clear local or remote monitoring and a documented process for fault reporting and firmware updates. | Monitoring functions, communication interfaces, data access, update process, troubleshooting support, and availability of service documentation. |
| Factory quality and supply capability | Set expectations for product consistency, production capacity, inspection, lead time, and shipment documentation. | Request a documented quality-control plan, traceability records, and a production schedule aligned with the project quantity and delivery date. | Factory audit options, incoming and final inspection procedures, serial-number traceability, defect handling, quality records, and shipment inspection arrangements. |